Residential🇲🇾 Klang ValleyInstalled Jun 2024

Zeroing the bill in Klang Valley

A family of four in Shah Alam paired an 8 kWp rooftop solar system with a Tesla Powerwall 3 to virtually eliminate their electricity bill. Before installation, their average monthly bill was RM 480. After 6 months, their average bill dropped to RM 60.

System
Tesla Powerwall 3
Capacity
13.5 kWh
Solar
8 kWp
Monthly Savings
RM 420/month
Payback
7 years

Key Results

  • Monthly bill reduced from RM 480 to RM 60
  • Self-consumption rate increased from 40% to 85%
  • Battery covers overnight AC usage (2 split units)
  • Exported only 3 kWh/day to grid under NEM 3.0

We were sceptical about the battery adding value on top of solar. But the numbers speak for themselves — we basically eliminated our night-time electricity cost.

Ahmad R. · Homeowner, Shah Alam
Residential🇸🇬 Bukit TimahInstalled Mar 2024

Landed property backup + savings in Singapore

A landed property in Bukit Timah installed a BYD BatteryBox Premium alongside a 6 kWp solar system. The primary motivation was backup power during grid outages, with cost savings as a secondary benefit.

System
BYD BatteryBox Premium HVS
Capacity
10.2 kWh
Solar
6 kWp
Monthly Savings
S$180/month
Payback
8 years

Key Results

  • Monthly bill reduced from S$320 to S$140
  • Provides 6-8 hours of backup during outages
  • LFP chemistry well-suited for Singapore heat
  • Estimated 10-year warranty with 80% capacity retention

After the 2023 outage that lasted 4 hours, we decided backup power was essential. The battery pays for itself in savings while giving us peace of mind.

Tan W.L. · Homeowner, Bukit Timah
Commercial🇹🇭 SukhumvitInstalled Sept 2024

Peak shaving for a Bangkok co-working space

A co-working space in Sukhumvit installed three Huawei LUNA 2000 units to shave afternoon demand peaks. Combined with rooftop solar, demand charges dropped by 40%. The system also provides seamless backup for critical IT equipment.

System
Huawei LUNA 2000
Capacity
30 kWh (3 × 10 kWh)
Solar
20 kWp
Monthly Savings
฿15,000/month
Payback
5 years

Key Results

  • Demand charges reduced by 40%
  • System ROI in under 5 years
  • 3-phase setup covers all office circuits
  • Remote monitoring via Huawei FusionSolar app
Commercial🇵🇭 CebuInstalled Nov 2023

Off-grid solar + storage for a Cebu beach resort

A small beach resort on Cebu Island moved to a hybrid solar + battery system to reduce reliance on expensive diesel generators. The Pylontech stack provides reliable evening power for guest rooms and common areas.

System
Pylontech US5000 × 4
Capacity
19.2 kWh
Solar
15 kWp
Monthly Savings
₱25,000/month
Payback
4 years

Key Results

  • Diesel generator runtime reduced by 70%
  • Fuel cost savings of ₱25,000/month
  • Silent operation improved guest experience
  • Stack expandable to 38.4 kWh

Our guests come for the quiet and the nature. Switching from a noisy diesel generator to silent battery power was the best decision we made.

Maria C. · Resort Owner, Cebu
Industrial🇮🇩 Cikarang Industrial EstateInstalled Jan 2024

Industrial demand management in Jakarta

A garment factory in Cikarang deployed a 100 kWh BYD commercial BESS to flatten demand peaks and reduce their peak demand tariff. Combined with rooftop solar, the factory reduced their overall electricity cost by 25%.

System
BYD Battery-Box Commercial
Capacity
100 kWh
Solar
60 kWp
Monthly Savings
Rp 18,000,000/month
Payback
6 years

Key Results

  • Peak demand reduced by 35%
  • Overall electricity cost down 25%
  • Battery provides 2-hour backup for critical machinery
  • PLN demand tariff savings compound annually